• 向日葵黄色网站,向日葵视频免费下载,向日葵成人黄色视频,向日葵视频污在线观看视频

    Current locations:Home > Product > Steel wire annealing > Aluminum bar forging furnace

    2020-07-20 17:48:44

    Share
    • Share to WeChat Moments

    Round steel forging diathermy equipment

    • Description

    圖片012.png

    Operation steps of round steel forging diathermy equipment and bar diathermy forging equipment

    1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

    2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

    3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

    4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

    5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

    6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

    7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


    Maintenance of round steel forging diathermy equipment and bar diathermy forging equipment

    When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

    高頻10.jpg


    Recommended Products

    HOME About Us Product News Case Video Advantages Contact
    網站地圖向日葵视频在线下载 向日葵视频污下载 向日葵黄片软件下载 草莓视频下载APP免费观看在线下载 茄子视频在线播放 国际版抖音TIKTOK色板APP下载 麻豆黄色网站 黄瓜视频污版